TABLE OF CONTENTS
7. ENVIRONMENTAL COMPLAINT
AND NON-COMPLIANCE
8. IMPLEMENTATION
STATUS OF ENVIRONMENTAL MITIGATION MEASURES
FIGURES
Figure 1 Project General Layout
Figure 2 Air
and Noise Monitoring Locations
LIST OF APPENDICES
Appendix
A |
|
Appendix
B |
|
Appendix
C |
|
Appendix
D |
|
Appendix
E |
|
Appendix
F |
|
Appendix
G |
|
Appendix H |
|
Appendix I |
|
Appendix
J |
|
Appendix K |
Weather and Meteorological Conditions
during Reporting Month |
Appendix
L |
|
Appendix M |
|
Appendix N |
|
|
|
i.
The
Civil Engineering and Development Department HKSAR has appointed MateriaLab Consultants Limited (MCL) to undertake the Environmental
Team services for the Project and implement the EM&A works.
ii.
This
Monthly EM&A report presents the environmental monitoring and audit works
for the period between 1 January 2017 and 31 January 2017. As informed by the
Contractor, major activities in the reporting month were:
Temporary utility diversion;
Implementation of Temporary Traffic
Arragement (TTA);
Construction of Tunnel structure;
Construction of Subway B;
Construction of guide walls and D-walls;
and
Construction of District Cooling System
Works.
Breaches of the Action and Limit Levels
iii.
No Action / Limit
Level exceedance was recorded for 24-hr TSP and construction noise at KTD1a,
KTD2a and KER1b in the reporting month.
Complaint,
Notification of Summons and Successful Prosecution
iv.
A compliant received
on 7th December 2016 was referred from EPD on 15th December 2016 regarding the
sand and mud dropped from the vehicle that caused Cheung Yip Street and Shing
Cheong dusty. The notification of complaint was received by ET on 27th January
2017.
Reporting
Changes
v.
There was no
reporting change in the reporting month.
Future
Key Issues
vi. The key issues to be considered in the
coming reporting month include:
Potential environmental impacts arising from
the above construction activities are mainly associated with construction dust,
construction noise, water quality, waste management and landscape and visual
impact.